Major Structure Rehabilitation of a 14 Span, 343m long, Simply Supported Steel I-Girder Bridge with a Precast Concrete Deck over the Winnipeg River on PR 313 near Lac Du Bonnet, MB
Client: Department of Manitoba Infrastructure
Value: $19,000,000
Rehabilitation of the structural concrete and associated roadworks at the Archibald Underpass in Winnipeg, MB
Client: City of Winnipeg
Value: $3,500,000
Construction of a Semi-Integral, Continuous Span, Steel I-Girder Bridge with a Reinforced Cast-In-Place Concrete Deck over Whitemouth River on TCH 1E (EBL) in the vicinity of Prawda, Manitoba.
Client: Manitoba Department of Infrastructure; Water Management & Structures Branch
Value: $3,500,000
Construction of a Cast-In-Place Reinforced Concrete Box Culvert on Nisco Creek at the Intersection of Rd. 72N and Rd. 161W.
Client: Prairie View Municipality
Value: $1,600,000
Graham Creek, Melita Manitoba
Construction of a 3 span steel and precast structure over the Graham Creek in Melita, MB
Bosshill Creek, Virden Manitoba
Construction of a 2 span steel and precast structure over the Bosshill Creek in Virden, MB.
Client: Manitoba Infrastructure and Transportation
Value: $2,347,000
Construction of two new cast in place single and double cell box culverts across Hwy 12 and associated roadworks in Pine Creek, MB
Client: Manitoba Infrastructure and Transportation
Value: $1,600,000.00
Construction of two new single span 45 meter long cast in place concrete and steel bridges and associated roadworks. One located on PTH 20 over the fork River and the other located on PTH 10 over the Drifting river just North of Dauphin, MB.
Client: Manitoba Infrastructure and Transportation
Value: $6,000,000.00
Rehabilitation of existing twin bridges on the South perimeter spanning Pembina Hwy and associated roadwork in Winnipeg, MB
Client: Manitoba Infrastructure and Transportation
Value: $8,100,000.00
Rehabilitation of a nine span steel girder and reinforced concrete bridge over the Red River and associated road work east of Morris, MB.
Client: Manitoba Infrastructure and Transportation
Value: $17,500.000
Assembly and installation of a temporary two span Acrow panel bridge spanning the Souris River near Hartney, MB.
Client: Manitoba Infrastructure and Transportation
Value: $2,000,000
Construction of a steel through-plate-girder single track rail bridge spanning the Red River Floodway and associated rail embankment work in Winnipeg, MB.
Client: Manitoba Floodway Authority
Value: $20,000,000
Construction of twin three lane vehicle bridges spanning the Red River Floodway and associated road work in Winnipeg, MB.
Client: Manitoba Floodway Authority
Value: $32,000,000